Ibis Styles Aero 44 — 72 rooms & 7 luxury suites
Renovation of 72 rooms and 7 luxury suites, including interior fit-out and shared spaces.
Explore the project ↗
Plan hotel bathroom works with MontMR. Discuss existing services, waterproofing, sanitary fittings and finishes alongside the guest room programme.
Request a free quote01
Hotel bathroom refurbishment involves more than replacing visible tiles. Substrates, drainage positions and existing connections may limit a proposed layout. Bathrooms that look identical on a drawing can still require different preparation on site. Describe known defects and the fittings you intend to retain. This helps distinguish a finish update from a wider refurbishment involving changes to the arrangement and existing services.
02
Waterproofing and finishes need consideration together, particularly at corners, pipe penetrations and the junction between shower and floor. Tile dimensions also affect cuts and transitions. Before selecting a surface, establish which substrates are involved and what build-up is proposed. This allows the desired appearance to be assessed alongside the room's practical constraints, rather than treating waterproofing as a separate detail after materials have been ordered.
03
Everyday cleaning and maintenance should inform fixture choices. Awkward corners and concealed components without suitable access can create avoidable difficulties for hotel staff. Discuss housekeeping needs, access to connections and preferred product references during preparation. These considerations help compare options beyond their appearance in a photograph and make the brief more useful for bathrooms that will be used by successive guests and maintained frequently.
04
Bathroom and bedroom refurbishment need a shared scope wherever the works meet. Thresholds, doors, protection of retained surfaces and routes for workers all need clarification. Include the number of bathrooms, layout variations and intended working periods in your quote request. Phasing and the possibility of keeping selected rooms available require review with the operator; they depend on the property and the arrangements agreed for the project.
Explore your project
MontMR projects in Belgium: explore the renovated spaces, the finishes and the scope of each project.

Renovation of 72 rooms and 7 luxury suites, including interior fit-out and shared spaces.
Explore the project ↗
Renovation of 46 rooms at Gresham Belson Hotel, including bathrooms, furnishings and interior finishes.
Explore the project ↗
A renovated mock-up room with wood-look furniture, terracotta accents and a coordinated bathroom.
Explore the project ↗MontMR can handle the renovation work, floor and wall finishes, equipment, furniture and interior fit-out. Retained elements, supplies and finishes are agreed with you within the quotation scope.
The price depends on the property’s condition, floor area, technical work, materials and furniture selected. Send the address, photographs, available drawings and your priorities. A site visit or project review then helps define the work and outstanding decisions.
Duration depends on the agreed scope, preparation, access and deliveries. The programme is defined for your project before work starts; a fixed duration without assessing the property would be unreliable.
Available areas, circulation, working hours and protection are reviewed with the operator. Phasing and any continued operation must be agreed for the building and proposed work.
TURNKEY RENOVATION
Hotels, houses, apartments and professional spaces: MontMR handles your turnkey renovation through to furniture and interior fit-out. We coordinate the work, material choices, equipment and finishes to deliver a cohesive space, ready to use.